| Working on the inside of the new shop. |
|

|

|
|
Just getting started insulating. 11/21/02 |
The sliding door from the inside. |
|

|

|
|
Put in the last clerestory window in and started
insulating the ceiling |
Passed the wiring inspection. 750' 12-2 wire, 7-20A 120V
and 3-30A 240V circuits. Plenty of outlets, dimmer switches for the
halogen lights on order and boxes for ceiling fans. |
|

|

|
|
The insulation is all hung. |
|
Previous
Pages 1 2 3
4 5 6 7
8 9 10
Next |