Working on the inside of the new shop.

Drywall going up. 12/2/02

12/03/02

Drywall taped and mudded and finish room framed 12/9/02

Finish room covered with drywall and electrical installed.

Painting the floor gray 12/10/02

 

First coat on the floor.

A retaining wall of 4x4s for filling in level to the door. 12/9/02

Steps down from the retaining wall.

Area filled with about 6 yards of gravel.