| Working on the inside of the new shop. |
|

|

|
|
Drywall going up. 12/2/02
|
12/03/02
|
 |
 |
|
Drywall taped and mudded and finish room framed 12/9/02
|
Finish room covered with drywall and electrical
installed.
|
|

|

|
|
Painting the floor gray 12/10/02
|
|
|

|

|
|
First coat on the floor. |
A retaining wall of 4x4s for filling in level to the
door. 12/9/02 |
|

|

|
|
Steps down from the retaining wall. |
Area filled with about 6 yards of gravel. |
|